And the very start of a ceiling...
Wednesday, May 18, 2016
Tuesday, May 17, 2016
Lots Happening
Since we are trying to get the pool inspection on Thursday, they had to build our gates today. One on the front of the house and one to hide the pool equipment (they still need to be painted)...
They installed the track for the pool cover...
Our cabana ceiling planks were delivered...
And we have the kitchen counter forms all ready for the concrete pour!
Friday, May 13, 2016
Lights, Wiring, Action
We have the cabana all wired for lights, outlets, heaters and tvs...now the wall and ceiling can go up!
The kitchen/bar is coming along, but looks more like a hat and drink rack right now. ;)
Our contractor figured out where all the appliances will go...
Starting on the left it's the two drawer fridge, regular fridge, grill, sink/cooler and ice machine.
And they continue to work on the brick (this brick has been quite the process! I wasn't happy with it so they had to sand it down and start over!!).
Thursday, May 12, 2016
The Stage
Since the fire pit area is raised with steps, the kids think it's a stage! And even better are the two raised tables on the benches. So when I walked outside, I found them doing the whip and nae nae like this...
It doesn't look like it, but we are getting close. The brick still needs to be treated to make it lighter, and the bench will be regular cement color- the white is just a treatment they put it on it. And of course we need trees, lots of them, to cover up the hideous block wall. I'm told this will all be completed within the next few weeks!
We made the final decisions yesterday (appliances, lighting, tree/shrub selection, ground cover, etc.), and our contractor says everything goes fast now!
The water line tile is in. It looks boring, but I love it.
Thursday, April 28, 2016
The Start of a Fire Pit
We have the start of a fire pit and a portion of the pillars...
Here is our outdoor kitchen...
Sunday, April 24, 2016
The Final Concrete Pour
The guys worked 7 days this week so that they could complete all the concrete!
We have more pavers around the pool (these will also be surrounded by brick)...
A floor in the cabana!
A footing for the outdoor kitchen/bar...
And stairs/floor for the fire pit area!
Thursday, April 21, 2016
Forms
We have more concrete forms, but nothing exciting. It seems like a lot is waiting on this next concrete pour, and I have no idea when that's happening because we couldn't decide on a kitchen layout so that's not even formed yet.
We have the coping and deck jets all set, and the brick is grouted...
Subscribe to:
Posts (Atom)